Amwin comprehensively implemented the construction of a warehouse in Buk. Work on the facility began with the development of an architectural concept and the demolition of the existing buildings. A comprehensive construction design was then completed, followed by the comprehensive construction of a steel-framed logistics facility. Amwin also handled the development and hardening of the area surrounding the facility, the installation of flooring, the installation of modular shelving, and the installation of all installations. The hall’s enclosure is made of sandwich panels, and the roof is covered with a sheet metal/insulation/membrane system.